Full refurbishments, property conversions, de-conversions, retrofit environmental upgrades, strip outs, reconfiguration, fire damage, heating and ventilation systems, plant rooms, comms, AV installations, air con, major repairs, structural works, demolition, underpinning, cladding, masonry, grade listed, abseiling – AD have done it all!
AD have vast experience of major works projects ranging from complete building / property refurbishments - through to complex structural works, or even high-tech innovative conferencing suites within restricted access and contamination area facilities.
Our projects are wide ranging and our solutions cost effective and innovative.
Zero Carbon, Environmental Upgrade and Improvement Experts
AD are experts in delivering a full scope of energy efficiency improvements; everything from small improvements per property such as loft insulation, to large scale external wall insulation works; our experienced teams also specialise in full 'whole house' retrofit solutions for maximum environmental improvement.
Insulation
Solid Wall Insulation (internal or external)
Cavity Wall Insulation
Under-floor Insulation (solid floor, suspended floor)
Loft Insulation
Flat Roof Insulation
Pitched Roof Insulation
Room in Roof Insulation
Low Carbon Heat
Air Source Heat Pump
Ground Source Heat Pump
Solar Thermal (liquid filled flat plate or evacuated tube collector)
Biomass Boiler
Hybrid Heat Pump
Windows and Doors
Draught Proofing
Double or Triple Glazing
Secondary Glazing
Energy Efficient Replacement Doors
Heating Controls and Insulation
Hot Water Tank Thermostat
Hot Water Tank Insulation
Heating Controls (such as, appliance thermostats, smart heating controls, zone controls, intelligent delayed start thermostat, thermostatic radiator valves)
Zero Carbon Retrofit Project Example – MyPowerHouse
Project: Conversion of a Former Industrial Unit to an Energy Efficient Multipurpose Space.
Overview of Project Scope: AD Construction Group is currently carrying out retrofit and building improvement works to convert a former industrial unit into a modern, energy efficient multipurpose space in Sidcup, Kent – ‘MyPowerHouse’.
Once completed, the building will provide hot-desk/local office facilities as well as a workplace extension of AD’s adjacent building to AD employees. As a further tranche to project’s holistic carbon reduction plan, retrofit will also house 20 x Electric Vehicle Charging Points (EVCP). We strive to be forward thinking on all energy efficiencies from start to finish, following PAS2035 framework, using a fabric first approach – building tight and ventilating right - as part of specification design work to reduce heat demand as far as possible through improving building fabric before introducing new energy systems.
Local subcontractor Ozone EPC conducted an EPC survey, identifying ways to improve efficiencies and overall building EPC rating. Following detailed building assessment by our design lead, we determined measures and materials fit for the purpose of providing overarching energy efficiencies to reduce building’s energy consumption and carbon emissions, all factored into retrofit design.
MyPowerHouse building is being fitted with insulation and double glazing to ensure airtightness, we are using low carbon technologies such as upgraded heating systems, and mechanical ventilation systems with heat recovery, and installing photovoltaic panels to generate renewable electricity for the building. All materials have standard guarantees.